Technical Consultation Desk

Request Technical Review & Quotation

Send us your 2D/3D drawings, sample parameters, or application operating conditions. We coordinate the review with the partner-factory engineers and reply within our stated response time, which is typically 3 business days. The technical review itself is set by how complete the drawing and process data are.

Step 01 · Drawing & Parameter Intake

Project RFQ Specification Form

✓
3 business days Typical First Reply to a Quote Request
✓
Bilateral NDA Signed per project where the exchange requires one
✓
Single Contract Order Terms & After-Sales With Us

Include cold-start conditions and the highest temperature the magnet reaches in service. Leave this blank if the range is not yet known.

Leave this blank if it is not decided yet. A drawing, a sample or a photograph with N and S marked is enough to start — what you choose here is your reference for the conversation, not an approved manufacturing specification.

Grade, tolerance and working temperature can be left blank if they are not fixed yet — they are confirmed during the review.

Supported formats: PDF, STEP, STP, DWG, DXF, PNG, JPG (up to 5 files, 25 MB each).
Files are shared only as far as the project requires for the part to be assessed. They are kept with the inquiry and are not published publicly.
We acknowledge receipt and typically reply within 3 business days; where the drawing is incomplete we come back with the questions first, and the review starts from there. A technical evaluation takes as long as the drawings and the project data require.
First Reply From the Project Team

Direct Project Contact

Prefer to discuss an urgent motor program directly or email large STEP assemblies exceeding 25MB? Reach our project coordinators directly:

Project Teaminfo@profurther.com
Direct LocationMa'anshan, Anhui Province, China
Working HoursMon – Fri, 08:30 – 18:00 (GMT+8)
Typical First ReplyWithin 3 business days
Email Drawings to info@profurther.com
Confidentiality

Bilateral Non-Disclosure Agreement (NDA)

An NDA is signed per project where the exchange requires one, before drawings or models are examined. Project files are used for the project they were sent for and are not published.

Inspect Compliance & IP Policy →
Disciplined Project Execution

What Happens Next?

Every inquiry is reviewed by the project team: the drawing, the tolerances and the quantities are checked, and the questions that remain open come back to you before anything is quoted.

Read the 10-Step Process →
Start Technical Review

Have a Magnet Drawing, Sample or Application Requirement?

Send us your 2D/3D CAD drawings, sample parameters, or operating temperature requirements. We make a first-round feasibility judgement and typically reply within 3 business days; a technical evaluation takes as long as the information and the project require.

Request Technical Consultation View 10-Step Process