Project evidence kept as records: the starting point, the stage reached, the technical assessment, the actions taken and the outcome the record itself states.

Case Type Delivered Project, or Technical Evaluation — each record is labelled with the type it is filed under.
Starting Point The item the project began from: a drawing, a physical sample, or an application requirement.
Project Stage How far the record reached, from evaluation through sampling and approval to delivered.
Recorded Outcome What the record itself states about the result, quoted as the record carries it.
Recorded Projects

Every Case Record, With Its Own Type and Stage

Each card states the type the record is filed under, the starting point the project came from, the stage the file reached and the outcome the record reports — so a delivered project and a technical evaluation are read as what they are.

Delivered Project

Ferrite Arc Magnets for Water Pump Yokes

An arc segment for a water purifier pump motor yoke: two per steel yoke, outer R35.5 ±0.1, wall 8.5 −0.1/0, Br 380–400 mT, supplied uncoated and unmagnetized in 30–35 day batches.

Starting Point Drawing
Project Stage Delivered
Recorded Outcome

The first samples passed the customer's yoke assembly check, bulk purchasing followed, repeat orders have continued since 2017, and the series has extended to several arc sizes for other pump motor builds. Production ran to the drawing: outer radius R35.5 +/-0.1 mm, inner radius R27 +0.2/0 mm, wall 8.5 -0.1/0 mm, section 63 +/-0.1 by 40 +/-0.5 mm, end chamfer 2 x 45 degrees, grade Br 380-400 mT, supplied uncoated and unmagnetized. Batches ship as one full 20GP container with 30-35 days of lead time, and acceptance is by assembly in the customer's own yoke.

Materials Hard Ferrite (Ceramic) Magnets
Applications Electric Motors & Drives
Delivered Project

Ferrite Arc Magnets for Fan & Blower Motors

Ferrite arc magnets to drawing for axial fan and blower motors, held by U-shaped clips. The end chamfer was opened so the segment seated fully.

Starting Point Drawing
Project Stage Delivered
Recorded Outcome
  • The axial fan project included a chamfer adjustment to address the fit between the magnet end and the plastic clip holder, so the U-shaped retaining clip could engage securely. Samples were confirmed by the customer in its assembly before bulk purchasing.
  • ProfurtherMag has continued working with this customer since 2018, supplying ferrite arc magnets for both automotive axial fan and blower motor applications. The assembly adjustment described here concerns the axial fan project; the blower supply is a separate part of the same customer relationship.
Materials Hard Ferrite (Ceramic) Magnets
Applications Automotive Auxiliary Systems Electric Motors & Drives
Technical Consultation

Facing Similar Field Failures or Second-Sourcing Delays?

Send us your failed sample parameters, operating conditions, or 2D/3D GD&T drawings. We reply with a first-round feasibility judgement and the points that still need testing.

Submit Project for Feasibility Review Inspect 6-Stage Quality Control
Start Technical Review

Have a Magnet Drawing, Sample or Application Requirement?

Send us your 2D/3D CAD drawings, sample parameters, or operating temperature requirements. We make a first-round feasibility judgement and typically reply within 3 business days; a technical evaluation takes as long as the information and the project require.

Request Technical Consultation View 10-Step Process