Case Type

Delivered Project

Case records filed under this case type.

Project Evidence

Case Studies in This Type

Delivered Project

Ferrite Arc Magnets for Water Pump Yokes

An arc segment for a water purifier pump motor yoke: two per steel yoke, outer R35.5 ±0.1, wall 8.5 −0.1/0, Br 380–400 mT, supplied uncoated and unmagnetized in 30–35 day batches.

Delivered Project

Ferrite Arc Magnets for Fan & Blower Motors

Ferrite arc magnets to drawing for axial fan and blower motors, held by U-shaped clips. The end chamfer was opened so the segment seated fully.

Start Technical Review

Have a Magnet Drawing, Sample or Application Requirement?

Send us your 2D/3D CAD drawings, sample parameters, or operating temperature requirements. We make a first-round feasibility judgement and typically reply within 3 business days; a technical evaluation takes as long as the information and the project require.

Request Technical Consultation View 10-Step Process